Enter comments or questions below. Submitting feedback Thank you for your feedback! Cancel Submit Feedback. How am I doing? Chat with DAU Assistant. It looks very straight forward but looks are deceiving. As example, contract deliverable data is often identified with a specific due date associated with a program milestone.

Program managers and systems engineers need to monitor this on an as released basis. No company has the data pipeline bandwidth or the staff to hold deliveries until the specified date.

Data deliveries for documents like drawings, test procedures, test reports, analysis, inspection reports, and performance demonstration reports have to be released and delivered with precision.

As a result there are multiple data deliverable pipes running in parallel at any one time which are often disconnected. Going back to the fundamentals, we recall that all items under configuration control are subject to the five pillars of a sound CM implementation. Items not designated as CIs are also subjected to verification and audit activities. This is where continuous auditing becomes critically important.

The continuous iterative process of audit, release, and delivery — instead of release, delivery, then audit — is a capability provided by the configuration management plan and change control system because:.

FCAs and PCAs are the two processes used to address these goals and thus verify that the end item delivered was vetted against requirements stated in the contract award.

When the results of the FCAs and PCAs are combined they offer tangible proof that a controlled design, fabrication, test, and documentation system exists; and the product not only performs as required but you know what you manufactured and can replicate it. FCA and PCA findings and observations can be positive or negative and they can be written against the customer or the contractor. Findings require a succinct statement of fact based on what is found or observed. In this way, the audit is effectively accomplished with a minimum of complications.

Please note that you should expect to receive a response from our team, regarding your inquiry, within 2 business days. Turn on more accessible mode. Turn off more accessible mode. Acquipedia Sign In. A PCA is normally conducted when the government plans to control the detailed design of the item it is acquiring via the Technical Data Package. The PCA is complete when the design and manufacturing documentation match the item as specified in the contract.

After successful completion of the audit and the establishment of a Product Base Line PBL , all subsequent changes are processed by formal engineering change action.